Diamond Street Drainage Improvements

This project includes (all values are approximate) 27 stormdrain structures, 1150 linear feet of 15” to 24” HDPE Pipe, 32 linear feet of RCP, several short concrete aprons/channels, and associated concrete and asphalt work. Also included are relocations of all interfering utilities including, but not limited to: water, sanitary sewer, stormdrain, gas, electric, fiber optic, and communications, along with bypass pumping, restoration, appurtenances, etc. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; re-establishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.